Mivan is a quality aluminum structure developed This innovative form of work is actually suitable for constructing houses in large quantities at a rapid pace. The speed of construction needs to be given greater importance, especially for large housing projects or township projects. In order to respond to these unusual challenges in terms of time, cost and quality, the construction industry has come up with a smart method of construction known as the “MIVAN formwork system”.
Mivan technology has been used widely in Europe, Asia, Gulf Countries, and other parts of the globe. It is suitable for constructing a large number of houses in a short period of time using room size forms to construct walls and slabs in one constant pour on concrete.
Advantages:
Mivan Formwork requires relatively less labor
Faster completion of floors
Lesser number of joints and reduced leakages
Smooth finishing of wall and slab
Low maintenance
More seismic resistance
Huge carpet area
Good quality construction work
Faster completion
No need for plastering
Area of use
Mivan technology is preferred for constructing a large number of houses in a limited period of time without any hassles. This technology also makes use of room size structures to construct slabs and walls. It permits shuttering for both slabs and columns in construction. Walls of huge room size, as well as floor slabs, are done right through this kind of Mivan shuttering.
The key uses of Mivan shuttering
Easy to operate within less time
Includes the 3S scheme of construction to give strength, safety, and speed
Slabs and walls are easily formed in one consistent development
Assembling and fitting the part of shuttering
Beam construction and column are removed
Construction of slabs and walls in a simultaneous way
The major features of Mivan Formwork:
Load Carrying Capacity
Striking Time
Durability
Cycle Time
Construction techniques of Mivan Formwork
Assembling The Wall Reinforcing Steel:
This is used to give structure to the building and hold the concrete until they gain 50% of the required strength. The aluminum formwork is set around the factory-made steel mesh which is instantly built on the construction site.
Placement Of Aluminium Formwork:
Along with the wall strengthening steel, room-sized walls and structured floor slabs are built. The aluminum metal slabs are very easy to handle and are also very accurately made. The pin and spearhead system is used to combine these structures, and these can be instantly destroyed once the concrete structure is ready.
Pouring Of Concrete:
After the forms are shaped, high-quality concrete is poured into the structure. The cast is later removed to make way for a hard-concrete structure backed by wall strengthening steel. .
+919024909286
+918233373376
TAKE QUOTATION FIRST
QUOTATION IS Chargeable
MPK BANK
42522283754 FOR TRADE ( MINIMUM THRESHOLD APPLY)
State Bank of India
IFSC CODE
SBIN0031213
PANCARD
BVIPN4554J
GST
08BVIPN4554J2Z3
AICTE CODE
15EIUCE240
SWIFT CODE
SBININBBJ12
SBI SAVING
51102744457
IFSC CODE
SBIN0031213